Construction
Concrete Volume
Volume of concrete needed for a slab, plus 10% waste allowance.
Inputs
Concrete Volume
Result
Concrete needed
3 m³
- With 10% waste
- 3.3 m³
- Cubic yards
- 3.92 yd³
Ordering the right volume
Concrete is sold by the cubic yard (US) or cubic meter (metric). Compute length × width × depth in consistent units, convert to yards or meters, and add 5–10% for waste, spillage, and uneven subgrade. Under-ordering means an emergency second truck; over-ordering wastes money.
Related take-offs
Estimating other materials for the same project? Use the Paint Calculator, Tile Calculator, or Lumber Calculator.
Related calculators
Construction
Tile Calculator
How many tiles you need for an area, with waste allowance.
Construction
Paint Calculator
Liters of paint required, allowing for coats and coverage.
Construction
Roof Pitch Calculator
Convert roof pitch (rise/run) to angle in degrees and slope percent.
Construction
Board Feet Calculator
Compute board feet of lumber for pricing and take-offs.
