Construction
Gravel Calculator
Volume, tonnage, and bag count for a gravel area — with a 10% waste allowance.
Inputs
Gravel Calculator
Result
Gravel needed
1.3 t
- Volume
- 0.9 m³
- With 10% waste
- 1.43 t
- 25 kg bags (with waste)
- 58
How it's calculated
tonnes = length × width × depth × density (depth in m, density in t/m³)
Common questions
Loose vs compact — which do I use?
Use the loose figure when ordering delivered gravel and the compact figure when estimating final in-place volume after tamping.
Why add 10% for waste?
Compaction, spillage, and edge losses eat into your order. A 10% buffer keeps a small shortfall from stopping the job.
Related calculators
Construction
Concrete Volume
Volume of concrete needed for a slab, plus 10% waste allowance.
Construction
Sand Calculator
Sand tonnage and 25 kg bag count for a fill area at your chosen depth.
Construction
Mulch Calculator
Volume and 50 L bag count for mulching a garden bed at a chosen depth.
Construction
Paint Calculator
Liters of paint required, allowing for coats and coverage.
